Modular Steel Bridges in Vietnam — Bailey Bridge Manufacturer & Supplier
Vietnam's expressway build-out and typhoon-exposed river network create steady demand for modular steel bridges. Evercross supplies engineered spans to Ministry of Transport PMUs — with e-procurement experience on muasamcong.mpi.gov.vn.
Why Vietnam needs fast-deploy steel bridges
- Central-region typhoons and floods destroy river crossings — modular bridges restore them within days.
- Expressway and industrial-zone programmes need temporary haul and detour bridges.
- Mekong Delta rural access programmes replace ferries with short-span steel bridges on soft soils.
Span & load quick facts
| Single span | 6 – 91 m |
| Carriageway | 3.15 / 4.2 / 7.35 m |
| Design loads | AASHTO · BS 5400 · Eurocode |
| Installation | 3 – 7 days, no heavy crane |
| Corrosion | ISO 1461 galvanized |
| Warranty | ≥ 12 months |
Track record & references
Closest delivered references: 6 HD200 bridges in Tanzania (61 m single span) and 23 bridges for Ecuador's highway authority — the same mix of emergency restoration and rural access programmes.
Bridge systems
7 bridge types — Bailey, modular, truss, plate girder, box girder, suspension, floating.
Delivered projects
Browse completed bridges across 30+ countries with spans and configurations.
Certifications
ISO 9001/14001/45001, ISO 37001, GJB 9001C — all valid to 2028.
Who buys & how
- Ministry of Transport (MOT)
- Expressway & highway PMUs
- Provincial DOTs
- muasamcong.mpi.gov.vn registered bidders
National e-procurement (muasamcong.mpi.gov.vn) and PMU international tenders; TCVN/ASTM-compliant documentation provided.
Meet us in Vietnam
- VINAMAC EXPO — Ho Chi Minh City, late July
Vietnam project? Get a layout in 24 hours.
Send span, load class and site location — our engineer replies with a panel layout, container count and budget range.