Modular Steel Bridges in Saudi Arabia — Giga-Project & Road Supplier
Saudi Arabia's giga-projects and road programme need temporary and semi-permanent steel bridges on remote desert alignments. Evercross supplies modular spans designed to AASHTO with Gulf corrosion protection — delivered via Dammam or Jeddah.
Why Saudi Arabia needs fast-deploy steel bridges
- Giga-project site logistics (NEOM, Red Sea, Qiddiya) need heavy-load temporary bridges on new alignments.
- Wadi flood crossings on desert highways require rapid replacement after storm events.
- Remote-area and military logistics favour galvanized modular spans with low maintenance.
Span & load quick facts
| Single span | 6 – 91 m |
| Carriageway | 3.15 / 4.2 / 7.35 m |
| Design loads | AASHTO · BS 5400 · Eurocode |
| Installation | 3 – 7 days, no heavy crane |
| Corrosion | ISO 1461 galvanized |
| Warranty | ≥ 12 months |
Track record & references
Closest delivered references: 6 HD200 bridges in Tanzania (61 m single span) and 45 bridges for Myanmar Railways; C5-M coastal coating options for Gulf marine environments.
Bridge systems
7 bridge types — Bailey, modular, truss, plate girder, box girder, suspension, floating.
Delivered projects
Browse completed bridges across 30+ countries with spans and configurations.
Certifications
ISO 9001/14001/45001, ISO 37001, GJB 9001C — all valid to 2028.
Who buys & how
- Ministry of Transport & Logistic Services
- Road General Authority
- Giga-project EPC contractors
- Etimad platform registered bidders
Etimad portal tenders and EPC subcontracts; SASO/AASHTO documentation and third-party inspection (SGS/BV) provided.
Meet us in Saudi Arabia
- Saudi Build — Riyadh, November
- Big 5 Construct Saudi — August/September
Saudi Arabia project? Get a layout in 24 hours.
Send span, load class and site location — our engineer replies with a panel layout, container count and budget range.