Modular steel bridges · Factory since 2005 · Zhenjiang, China

Bailey & Modular Steel Bridges in the Philippines — Rapid-Response Supplier

Typhoons, earthquakes and landslides make the Philippines one of the most demanding bridge environments on earth. Evercross supplies rapid-response Bailey and modular steel bridges matched to DPWH standards — simply supported designs that dominate Philippine infrastructure for good reason.

Why Philippines needs fast-deploy steel bridges

  • Typhoon and flood seasons wash out DPWH national and local bridges — simply supported Bailey spans are fastest to launch and fastest to reuse.
  • Earthquake recovery requires bridges installable without heavy cranes on damaged approaches.
  • Island logistics favor containerized panels: everything ships in standard 40-ft containers to Manila, Cebu or Davao.

Span & load quick facts

Single span6 – 91 m
Carriageway3.15 / 4.2 / 7.35 m
Design loadsAASHTO · BS 5400 · Eurocode
Installation3 – 7 days, no heavy crane
CorrosionISO 1461 galvanized
Warranty≥ 12 months
Get specs & price

Track record & references

Relevant engineering base: rapid-response Bailey bridges for earthquake recovery, AASHTO-standard steel pedestrian bridges and S355JR portable bridge configurations for 2026 Philippine programmes — all detailed in our engineering notes.

Bridge systems

7 bridge types — Bailey, modular, truss, plate girder, box girder, suspension, floating.

Delivered projects

Browse completed bridges across 30+ countries with spans and configurations.

Certifications

ISO 9001/14001/45001, ISO 37001, GJB 9001C — all valid to 2028.

Who buys & how

  • DPWH — Department of Public Works & Highways — dpwh.gov.ph
  • PhilGEPS procurement portal
  • Provincial & city engineering offices

PhilGEPS-registered suppliers with DPWH-approved bridge items; we supply AASHTO LRFD design calculations, mill certificates and DPWH-format submittals.

Meet us in Philippines

  • PHILCONSTRUCT — Manila, June + regional legs

Engineering notes on Philippines

Philippines project? Get a layout in 24 hours.

Send span, load class and site location — our engineer replies with a panel layout, container count and budget range.

Request a quote